Step control

Step control

About time on analysis

In the analysis of FrontISTR, following definitions of "time" are used:

  • Current time : Total time from start of analysis.
  • Step time : Time from start in each of step.
  • Time span : Duration of time for each step.
  • Relative time : Ratio of "Step time" to "Time span".
  • Time increment : Increment from "Current time" to "time at which the equilibrium is attained".

Definition of terms for analysis time

Figure 4.7.1 Definition of terms for analysis time

Control for static analysis

A static analysis in FrontISTR consists of one or more (continuous) analysis steps. A set of boundary conditions is given in each step and the analysis step is solved with incremental solving strategy which is mentioned previously.

Below, iteration of analysis is called "step loop", and incremental method is called "sub-step loop".

Incremental control of static analysis could be chosen from the following solution.

  • Analyze with fixed time increments. If convergence fails, the calculation will be stoped immediately.
  • Automatic time increment and cutback. Depending on the convergence, change the increment width. If the calculation fails, recalculate after decreasing the increment width.

Automatic time increment and cut-back

Flow is automatic time increment and cut-back is as follows(Figure 4.7.2).

Flow of automatic time increment and cut-back

Figure 4.7.2 Flow of automatic time increment and cut-back

Overview of program flows is as follows,

  1. Loop from step 1 to final step(N_step):
  2. The time increment base dtime_base is determined from the current dtime_base and the convergence status in the previous sub-step. First time uses initdt.
  3. The actual dtime is determined by "step end or the remaining time until the nearest specified output time and smaller of dtime_base.
  4. Try calculation of equilibrium of forces at time+dtime.
  5. If converge, the time is forward by dtime, when it fails, restore time and return to 2.
  6. Step ends when time reachs step end time.

If any of the following cases occurs during the analysis, the nonlinear static analysis is considered to have failed and the program terminates with error:

  • The number of sub-steps reaches the upper limit before time reaches the step end time.
  • The time increment dtime_base falls below the time increment lower limit mindt.
  • Analysis fails to converge consecutively for specified number (N_C) of times.

Adjust time increment baseline dtime_base

The first dtime_base of the step is set to the value of the specified initial time increment initdt. Otherwise, it is set as follows according to the convergence status of the previous sub-step.

  1. If analysis failed to converge and a cutback is made, the value dtime_base multiplied by R_C (reduction ratio of cutback).
  2. When be a successful to converge
    1. Corresponds to the decrease condition : the value of dtime_base multiplied by R_S (decrease ratio).
    2. In the case of an increase condition, not a decrease condition : the smaller value of 'dtime_base' multiplied by 'R_L' (increase ratio) and the time increment upper limit maxdt.
    3. If neither : dtime_base dose not change.

Increase / decrease conditions

When the automatic time incremental adjustment function determines to increase/decrease time increment, the following variables are used:

  • N_max : Maximum number of Newton iterations of previous substep.
  • N_sum : Total number of Newton iterations in the previous substep(Same as N_max, when there is no repeated contact).
  • N_cont : Number of contact iterations in previous substep.

Time increment is decreased when both of the following are met:

  • One of N_max, N_sum or N_cont exceeds the respective threshold NS_max, NS_sum or NS_cont.
  • When the above conditions are satisfied by a substep that continues N_S times or more.

Time increment is increased when both of the following are met:

  • N_max, N_sum and N_cont are all within their respective threshold NL_max, NL_sum and NL_cont.
  • The above condition is met by substep that continues more than N_L times.

Specify calculation time and output time

With automatic time increments, the increments change with the convergence state, so it is not possible to determine in advance when to run the equilibrium calculation and result output. If this is inconvenient, you can specify a list of output times to perform the equilibrium calculation and result output at the desired time.

For steps that include a list of output times, dtime is adjusted so that the calculation is always performed at specified time.

Usage of function of automatic time increments and cut-back

Settings related to this function are made in the analysis control file.

The function of automatic time increment and cut-back are enabled specified by INC_TYPE=AUTO on the !STEP card. For parameters that adjust the time increment, define !AUTOINC_PARAM and specify it in each step using the !STEP, AUTOINCPARAM'. If not specified, the default value of!AUTOINC_PARAM' is used.

The output time is specified for each step with the !STEP, TIMEPOINTS parameter after defining the time list with !TIME_POINTS.

Example

Enable automatic incremental adjustment and set initial time increment 0.01, step duration 2.5, time increment lower limit 1E-5, time increment upper limit 0.3, maximum substep number to 200. Specify AP1 for the auto-incrment parameter set and 1.5, 2.7 and 3.9 for the output time.

    !AUTOINC_PARAM, NAME=AP1
    0.25, 10, 50, 10, 1
    1.25,  1,  1,  1, 2
    0.25,  5
    !TIME_POINTS, TIME=TOTAL, TIME=,NAME=TP1
    1.5
    2.7
    3.9
    !STEP, INC_TYPE=AUTO, SUBSTEPS=200, AUTOINCPARAM=AP1, TIMEPOINTS=TP1
    0.01, 2.5, 1E-5, 0.3

Control for dynamic analysis

In this development code, dynamic analysis direct time integration method consists of one analysis step.

Incremental control for dynamic analysis is only fixed increments and automatic time increments are not available.